By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
The Himalayan InklineThe Himalayan InklineThe Himalayan Inkline
  • Home
  • Latest News
  • J&K
  • National
  • International
  • Sports
  • Opinion
  • Jobs
  • Education
  • Health
  • Photo Feature
Reading: Projects worth over Rs 48,520 cr unveiled by PM Modi in Bihar
Share
Sign In
Notification Show More
Font ResizerAa
Font ResizerAa
The Himalayan InklineThe Himalayan Inkline
Search
  • Home
  • Latest News
  • J&K
  • National
  • International
  • Sports
  • Opinion
  • Jobs
  • Education
  • Health
  • Photo Feature
Have an existing account? Sign In
Follow US
©2025 The Himalayan Inkline. All Rights Reserved.
Latest News

Projects worth over Rs 48,520 cr unveiled by PM Modi in Bihar

thehimalayaninkline
Last updated: May 30, 2025 12:47 pm
thehimalayaninkline
Share
2 Min Read
SHARE

PTI

KARAKAT (BIHAR): Prime Minister Narendra Modi on Friday launched development projects worth more than Rs 48,520 crore in Bihar’s Karakat.The PM, who arrived in Patna on a two-day visit to the state on Thursday, inaugurated the four-laning of the Patna–Gaya–Dobhi section of NH–22, worth around Rs 5,520 crore and four-laning of the elevated highway and grade improvements at Gopalganj Town on NH–27 at a function here. Modi dedicated to the nation the third rail line between Son Nagar – Mohammad Ganj, worth over Rs 1,330 crore, among others.Bihar Governor Arif Mohammad Khan, Chief Minister Nitish Kumar, Deputy Chief Minister Samrat Choudhary, union ministers and several other dignitaries and officials were present on the occasion.Karakat is a block in Rohtas district.The PM also laid the foundation stone for the Nabinagar Super Thermal Power Project, Stage-II (3×800 MW) worth over Rs 29,930 crore in Aurangabad district, which will aim at ensuring energy security for Bihar and eastern India.Further, in a boost to the road infrastructure and connectivity in the region, the PM laid the foundation stone for various projects, including the four-laning of the Patna–Arrah–Sasaram section of NH-119A, and the six-laning of the Varanasi–Ranchi–Kolkata highway (NH-319B) and Ramnagar–Kacchi Dargah stretch (NH-119D), and the construction of a new bridge over the Ganga river between Buxar and Bharauli.

You Might Also Like

Kashmir University Postpones All Exams Scheduled for May 7

Mock Drill on Disaster Preparedness Conducted in Kargil

All-Party Meeting Underway at SKICC Amid Shock Over Pahalgam Tragedy

Former Jharkhand CM Shibu Soren Passes Away; NC President Farooq Abdullah Pays Tribute

Kashmiri Doctor Arrested in Uttar Pradesh for Alleged Links to Jaish-e-Mohammed Posters

Share This Article
Facebook Copy Link Print
Share
Previous Article J-K Police’s counter insurgency wing conducts raids at multiple locations across Kashmir
Next Article India will use every method to deal with Pakistan-backed terrorism: Rajnath
Leave a Comment Leave a Comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Stay Connected

69.1kFollowersLike
69.1kFollowersFollow
56.4kFollowersFollow
136kSubscribersSubscribe
4.4kFollowersFollow
ThreadsFollow

Latest News

Anjuman-e-Sharie Shian Holds Muharram Preparatory Meeting in Srinagar
June 1, 2026
Two Drug Peddlers Arrested in Baramulla; 487.5 Grams of Opium Pods Seized
June 1, 2026
Saket Building Collapse: Rescue Operation Nears Completion; FIR Registered Against Owner
June 1, 2026
JK Police ASI Killed in Jammu Road Accident
June 1, 2026
//

Welcome to The Himalayan Inkline, your premier source for insightful, accurate, and timely news.

Categories

  • J&K
  • Education
  • Health
  • International

Categories

  • Jobs
  • National
  • Sports

Quick Links

  • Home
  • About Us
  • Contact
The Himalayan InklineThe Himalayan Inkline
Follow US
©2025 The Himalayan Inkline - By M/S THINKEAST
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?